
A top-tier construction firm from California, USA approached Hitech CADD Services for BIM modeling requirements regarding a large and complex public park project. The project was initiated with PDF files and conceptual hand-drawn sketches provided as input from the client. The team of experts at Hitech CADD Services carefully analyzed and integrated the IFC drawings & PDF files shared by the client into the modeling process.
Eliminating interdisciplinary clashes through alternate design, and keeping the architectural aesthetics intact, a 3D BIM model at LOD 300 was developed based on AIA regulations. This led to a significant business impact for the client through rework reduction, diminished material waste, negative clash-flow mitigation, improved scheduling, and accurate BOQ/BOMs.
Need greater project efficiency? Outsource your clash-resolution requirements to Hitech CADD Services for timely and accurate deliverables.