A Step-by-Step Guide to the Home Building Process

avatar
Vipin
A Step-by-Step Guide to the Home Building Process

Here's what to expect during the construction process' major stages.


It's exciting to start planning your new home, especially once you understand how the process works.


1. Prepare Construction Site and Pour Foundation


  • Apply for and Acquire Permits
  • Construction Crew Levels Site
  • Puts Up Wooden Forms for the Temporary Foundation
  • Isolated Footing Are Installed


2. Complete Rough Framing


  • Floor System, Walls, Roof Systems Are Completed
  • Sheathing Applied to Exterior Boundary Walls, Covered With Protective Wrap


3. Complete Rough Plumbing, Electrical HVAC


The Following Are Installed:

  • Pipes and Wires to flow 1 Unit Electricity
  • Sewer Lines and Vents
  • Water Supply Lines
  • Bathtubs, Shower Units
  • Ductwork for HVAC System
  • HVAC Vent Pipes


4. Install Insulation


Common Types of Insulation in New Homes

  • Fiberglass
  • Cellulose
  • Foam Mineral Wool
  • Revibration Concrete Blocks
  • Insulation Concrete Forms
  • Spray Foam
  • Structural Insulated Panels
  • Foam Board or Ridged Foam


5. Complete Drywall and Interior Fixtures, Start Exterior Finishes


  • Drywall is Hung and Taped
  • Texturing is Completed
  • Primary Coat of Paint is Applied
  • Exterior Finishes (Brick, Stucco, Stone) Are Installed


6. Finish Interior Trim, Install Exterior Walkways and Driveway



7. Install Hard Surface Flooring, Countertops; Complete Exterior Grading


Countertops, ceramic tile, vinyl, and wood flooring are all installed. Finish grading is completed on the exterior of the house to ensure proper drainage away from the house and to prepare the yard for landscaping.


8. Finish Mechanical Trims; Install Bathroom Fixtures


The electrical panel is finished, with light fixtures, outlets, and switches installed. The HVAC equipment has been installed, and the registers have been finished. Sinks, toilets, and faucets have all been installed.


Do you know how many types of road margin?


9. Install Mirrors, Shower Doors; Finish Flooring, Exterior Landscaping


Installation of mirrors, shower flush doors, and carpeting, as well as final cleanup. Planting of trees, shrubs, and grass, as well as other exterior landscaping, has been completed.


10. Final Walk-Through


This is where you spot items that need to be corrected or adjusted!


Also Read: Steps in Construction of Multi Storey Buildings