
Above-ground pools offer the same fun and enjoyment as underground pools, but with far greater economics, convenience, and speed of installation. An above-ground pool can take up to three months to build and can cost tens of thousands of dollars, but it can be assembled and filled with water in one day. Above-ground pools are also less expensive than underground pools.
Above Ground Swimming Pool Types
· Pools That Inflate
· Pools with Metal or Resin Frames
· Pools with Rigid Walls
Here are the steps to take:
1. Decide Choosing a Contractor: Hire or Do It Yourself
2. Request Permits
3. Select a Location
4. Prepare the pool's foundation.
5. Determine the Best Time to Install the Pool
6. Connect the Electrical Power
7. Pool Rigid Wall Pools Assemble
8. Pool Frames
9. Setup the Filter
10. Fill the Swimming Pool with Water
So why would you buy a vinyl liner pool?
- You can get whatever size and shape you want as these pools are highly customizable and size is not a limitation. Six kids and a big diving pool-no problem. You can’t say that with a fiberglass pool.
- While the liner has to be replaced every 10 years or so, there are hundreds of patterns and you get a whole new look when you do replace the liner. And while a liner might be more unpredictable than fiberglass, most of the issues associated with liners are manageable.
Do you need a professional pool contractor in Iowa? The Pool House is one of Iowa's leading pool companies in Iowa, offering above-ground pools, in ground pools, hot tubs, pool installation, and many other services.